Proposed 2020 Capital Project Scope
Critically Important Building Systems:
- Geothermal well vault, replace deteriorated valves
- Replace main heat pump loop pumps
- Upgrade antiquated fire alarm panel
- Generator replacement
- Replace 20-year-old pool dehumidification system
- Replace major air handling units
- Replace 20-year-old make-up air units
Building Envelope Improvements:
- Replace window systems building-wide
- Replace exterior ceramic wall tile with a more suitable building materials
- Replace EFIS also known as Dryvit at manufacturing technology area
Computer Technology Infrastructure:
- Replace existing clocks with new I.P. clocks and speakers
- Server enhancements and replacements
- Upgrade theatrical stage lighting and sound
Cafeteria Enhancements:
- Replace 20-year-old kitchen equipment
- Renovation to kitchen and cafeteria to increase capacity and flow
Technology Program Expansion:
- Expansion of the technology suite to house the reimagined wood shop program to augment the manufacturing technology program
Athletic and Site Facility Improvements:
- Tennis court restoration
- Scoreboard replacement at main gym
- Additional parking along loop near basketball/softball fields
- Replace playground equipment and replace wood chips with a new rubberized safety surface
- New synthetic turf field at athletic complex
- Replace main entrance sign and enhance signage campus-wide
- Upgrade athletic field lighting to LED
- Wrestling room expansion